bemainte depth ethra unde... can give one extra 12mm bar if the beam depth is less than 9" 3.6 meter span might be a room wall and mostly there will be load above the beam.. in that case the depth should be 30 CM if so go with 6 bars
better to put 6 if Load Comes on Top.. Either u can Use 4 Side 16mm and Midle 12mm too..
Architect & Designer Rasheed Bin Abubacker. Gazeebo Interiors the Design Space. 9562140940/- whatsup..
Mohamed Sajid
Civil Engineer | Malappuram
it's depend on load.muklail wall varunundo
Syamkumar Satheendran
Civil Engineer | Kollam
It depends on the load and span...
Asharaf AS AKS
Contractor | Palakkad
ആറ് റോഡു കൊടുക്കുക ഭാവിയിൽ മുകളിൽ എത്ര വെയിറ്റ് വന്നാലും പ്രശ്നമില്ല
Vaisakh Ramesh
Civil Engineer | Kannur
4 rod. Depends on load over the beam
Arun T A
Contractor | Thiruvananthapuram
bemainte depth ethra unde... can give one extra 12mm bar if the beam depth is less than 9" 3.6 meter span might be a room wall and mostly there will be load above the beam.. in that case the depth should be 30 CM if so go with 6 bars
Gazeebo Interiors
Interior Designer | Kozhikode
better to put 6 if Load Comes on Top.. Either u can Use 4 Side 16mm and Midle 12mm too.. Architect & Designer Rasheed Bin Abubacker. Gazeebo Interiors the Design Space. 9562140940/- whatsup..