the contract rates are different in different places.
even building to building it is different.
if you insist Primary steel, M30 mix etc the rates will vary.
also if lot of projections and. so called architectural projections etc are provided the cost will go high .
even paint cost will decide the rates
Unni Parameswaran
Contractor | Alappuzha
അല്ല
Sasikumar Therayil
Civil Engineer | Thrissur
the contract rates are different in different places. even building to building it is different. if you insist Primary steel, M30 mix etc the rates will vary. also if lot of projections and. so called architectural projections etc are provided the cost will go high . even paint cost will decide the rates
Roy Kurian
Civil Engineer | Thiruvananthapuram
അല്ല .Labourcharge , Transportation , material availability എന്നിവ അനുസരിച്ച് rate വ്യത്യാസപ്പെട്ടിരിയ്ക്കും.
ROY GEORGE
Contractor | Bengaluru
അല്ല
Sunil Raj
Contractor | Kanyakumari
ഇല്ല