clearly the person who designed missed punching shear check. , if pinching shear check was done thn this issue could have been cured with increase in slab thickness, adding drop on slab and other solution {{1629751732}} mentioned.
I agree with what {{1629751732}} has said here. but there can be one more reason. releasing the shoring(supports for formwork) prematurely can also lead to this failure. In this situation loads from two floors are acting on that slab. what my point is, this can be a workmanship issue also.
Dr Bennet Kuriakose
Civil Engineer | Kottayam
เดซเตเดฒเดพเดฑเตเดฑเต เดธเตเดฒเดพเดฌเต (beam เดเดฒเตเดฒเดพเดคเตเดค เดธเตเดฒเดพเดฌเต) design เดเตเดฏเตเดฏเตเดฎเตเดชเตเตพ crucial เดเดฏ เดเดจเตเดจเดพเดฃเต punching shear. Punching resistance เดเตเดเตเดเดพเดจเตเดณเตเดณ เดฎเดพเตผเดเดเตเดเตพ: 1. Increase column size 2. add drop for the slab 3. add column head 4. add punching reinforcements
Mariyamma M S
Civil Engineer | Thiruvananthapuram
punching shear failure.
Shekhar S
Home Owner | Ernakulam
clearly the person who designed missed punching shear check. , if pinching shear check was done thn this issue could have been cured with increase in slab thickness, adding drop on slab and other solution {{1629751732}} mentioned.
Mathews George
Civil Engineer | Thiruvananthapuram
Punching shear can be avoided if proper reinforcement can be provided. column capital is normally provided where PT SLAB is taking place.
jinson munjanattu
Civil Engineer | Ernakulam
I agree with what {{1629751732}} has said here. but there can be one more reason. releasing the shoring(supports for formwork) prematurely can also lead to this failure. In this situation loads from two floors are acting on that slab. what my point is, this can be a workmanship issue also.
m j c construction
Contractor | Ernakulam
no center beam and increase colum sizes
Mathews George
Civil Engineer | Thiruvananthapuram
I consider it as a design failure. one of the reason is inexperienced person provide the details.
chanchal Ansari
Contractor | Ernakulam
stills and cement and time 1 months next silab
chanchal Ansari
Contractor | Ernakulam
bhim illa