3.24 Kgs (0.0704 cft) sand and 0.72 Kgs cement required for 1 sq ft in 20mm thick plaster 1:4.
so total 432 kgs(approx) of cement is required to plaster 600 sqft of area with 20mm thickness. one bag of cement is 50kg, so approximately 8 Bags of cement is required to plaster 600 sqft of area with a thickness of 20mm.
(NB- it is advisable to have plastering with 10mm in average. so the cement required must be half of above mentioned. )
Reghu Ram
Home Owner | Palakkad
you will need 5 bags of cement, 25 cft of sand.Labour cost would be ₹7000/-. ( 4 days, 1 mason and 1 helper, 8 hrs per day).
DTALE | Architects | Interiors | Builders
Architect | Ernakulam
3.24 Kgs (0.0704 cft) sand and 0.72 Kgs cement required for 1 sq ft in 20mm thick plaster 1:4. so total 432 kgs(approx) of cement is required to plaster 600 sqft of area with 20mm thickness. one bag of cement is 50kg, so approximately 8 Bags of cement is required to plaster 600 sqft of area with a thickness of 20mm. (NB- it is advisable to have plastering with 10mm in average. so the cement required must be half of above mentioned. )
Ramco cements Ltd
Building Supplies | Alappuzha
use Ramco Super plaster having higher coverage area. contact our technical team Malappuram