We can start the design work at any point,
1, After designing the floor plans
2 ,after completing structure works
3, after completing tile, electrical, and other works
plan drawing varakkumbol thanne interior base cheythu design cheyanam. plan varachu vangumbol furniture place cheytha drawing odu koodi vangan nokkuka
interior lu plan lu place cheyunna oro window positions muthal oronnum namaludae interior manoharam akkum
Manu Philip
Interior Designer | Kollam
We can start the design work at any point, 1, After designing the floor plans 2 ,after completing structure works 3, after completing tile, electrical, and other works
joseph abraham
Home Owner | Ernakulam
don't give them any work they are cheaters Decorra interiors
Kitchen Galaxy Kitchen And Interiors
Interior Designer | Kollam
വീടുപണി തുടങ്ങുമ്പോൾ തന്നെ അതും പ്ലാൻ ചെയ്യണം. പ്ലാസ്റ്ററിങ് കഴിഞ്ഞാൽ gypsum, പിന്നെ flooring, പിന്നെ interior works.
Happyhome Interior
Civil Engineer | Thrissur
plese call me
Shrishti Homes and Interiors
Architect | Ernakulam
Design Stage ൽ തന്നെ തുടങ്ങണം. എന്നാലെ നല്ല Spacing കൊടുത്ത് furniture alignment ഒക്കെ ശരിയായി ചെയ്യുവാൻ കഴിയൂ.
DZIRE DESIGN STUDIO
Interior Designer | Kollam
plan drawing varakkumbol thanne interior base cheythu design cheyanam. plan varachu vangumbol furniture place cheytha drawing odu koodi vangan nokkuka interior lu plan lu place cheyunna oro window positions muthal oronnum namaludae interior manoharam akkum
aswathy s
Interior Designer | Kottayam
at the stage of plan drawing
Muhammad Shafeeque
Civil Engineer | Thiruvananthapuram
The connections and concealed fixing of plumbing, electrical and fire can be done before plaster works,
Muhammad Shafeeque
Civil Engineer | Thiruvananthapuram
After completing the structural works and before starting brick works needs to finalize detailed interior design plans.