Advisory Program
Smart Select
Projects
Live (New)
For Homeowners
For Professionals
unni krishnan
Home Owner | Palakkad, Kerala
distance between safety tank and bore well while constructing house
0
1
Comments
Sony k S
Civil Engineer | Pathanamthitta
minimum 7 ft
More like this
KT Mohamed Abdullah
Home Owner
As per the norms 7.5 meters minimum distance between SEPTIC TANK AND WELL IS ENOUGH, in between this distance is there any chances are there to mingle /mix both the water. Experts may kindly answer.. Thanks...
Akshay Prakash
Civil Engineer
LUVA PROPERTY ___________________ LAND LOCATION DETAILS HP AND INDIAN OIL PETROL PUMB RAILWAY STATION AND KSRTC BUS STAND RAJAGIRI HOSPITAL HMT JUNCTION KALAMASSERY ERNAMKULAM MEDICAL COLLEGE ELECTRONIC CITY, KINFRA PARK, BHARATH ELECTROIC LIMITED AND IT PARK NEDUMBASSERY AIRPORT Realty and Inf LAND DETAILS 15000 SQFT GODOWN BUILD WITH RCC COLUMN AND BEAMS 2 ENTRANCE AND ROAD TARRED WATER FACILITY ALUVA PROPERTY DETAILS HP AND INDIAN OIL PETROL PUMB RAILWAY STATION AND KSRTC BUS STAND RAJAGIRI HOSPITAL HMT JUNCTION KALAMASSERY ERNAMKULAM MEDICAL COLLEGE ELECTRONIC CITY, KINFRA PARK, BHARATH ELECTROIC LIMITED AND IT PARK NEDUMBASSERY AIRPORT Realty and Infrastructure Division under the VARISH TRUST 7373563939, 7373796868 LAND AROUND 5 ACRES AREA- KOMBARA JUNCTION ,NAD ROAD, ALUVA AROUND 8 LAKH PER CENT 15000 SQFT GODOWN BUILD WITH RCC COLUMN AND BEAMS 2 ENTRANCE AND ROAD TARRED WATER FACILITY- OPEN WELL AND BORE WELL whatsapp : 9539943503
Revathi S
Home Owner
iam planning to construct a house at palakkad, we constructing it in padding as we got permission to construction which will be the best way to construct house column or something and which brick to use
unni krishnan
Home Owner
rain water storage compelssory for all while constructing house?
mufeeda n
Civil Engineer
during a road developmnt alignment is changed and the gate of an already constructed house is moved a distance from garage. Now its a difficult to enter a car to garage and front yard is not so wide. Can this solved without demolish of garage
adarsh c
Civil Engineer
House for sale at elthuruth ,thrissur 4.5km from thrissur town 350mtr from state highway. 68 lakh 5.75 cent 1650sqft house 4bedroom 4 bathroom Dinning Living Kitchen and work area Balcony Open terrace Borewell with motor Compound wall with gate Schools and college,temple,church within 1 km distance.
Shiju Kurian
Home Owner
What is the standard size of septic Tank and let me know the distance from boarder. I have only the space infront of the house. Distance road to building 5 meter. Thanks
Sreekumar Sankar
Home Owner
For newly constructed house can i keep interior and exterior walls without painting for 2 years
Gem George
Home Owner
Hello. Pillars in my house are concreted after the wall is built. So the concrete is bind to the wall. Do we need to use chicken mesh in the joint between brick and pillars? The wall is constructed using clay bricks.
unni krishnan
Home Owner
what will be total cost for building a two storied house in 1000 square feet . expenses including flooring, electric, plumbing, safety tank,painting,wood work windows and doors only
unni krishnan
Home Owner
when we start electric and plumbing and painting works while constructing a house?
Join the Community to
start finding Ideas &
Professionals
Sony k S
Civil Engineer | Pathanamthitta
minimum 7 ft