1. Clearing and levelling site, digging well after preparing Plan and capable foundation design by an experienced person having Local body enlistment or Listed M panel (Civil Engineer / Architects /designers /Supervisors etc) who can obtain local body Permit. Soil Investigation (if found necessary) 2. Fixing lay out by marking pegs .3.Earthwork excavation and dressing bottom & Sides.4. Laying lean cement concrete.pcc 1:5:10. xxxxxxxxxxxxxxxxxxxx .Foundation footing (stone/RCC Strip or isolated footings basement etc.6. Casting 12. RCC. Plinth band (belt) & DPC.7. Filling inside base ment. 8 Superstructure like Load bearing wall or raisng columns.Casting Lintel &GF Sun shades 9. Raising wall and finishing with bearing plaster 1:3 & lime wash 10. Centring & Shuttering for F F beam & ടlabxxxxxxxxxxxxxxxxxxxxxxxxxxxxx 11. Reinforcement works &laying Electrical conduiting.12 Casting Slab & beams &rendering on Top surface of slab with wpc compound.13 Curing days to 14 days depend upon grade of cement and de shuttering works after 7 days for smaller spans up to 4.50 m & after14 days for Span up to 6.00 m.14. placing Conduits for concealed wiring on walls, Fixing concealed water supply pipes & attachments, testing leakage etc .15. Fixing outer frames of doors & windows.16. Internal & external Plastering. 17. Fixing Sanitary & water Supply fittings.&testing Water / Soil Waste lines.18. Laying Underfloor lean concreting.19. Flooring works.20 Fixing shutters for doors & windows, Cupboards, interior decoration, Electrical fittings,Kitchen cupboards and carpentry works.21 External service works like Septic tank ,over head tank, all pipe lines ,fittings & Finishing works and getting building No: & user certificate etc for occupation.
N UNNIKRISHNAN NAIR
Civil Engineer | Alappuzha
1. Clearing and levelling site, digging well after preparing Plan and capable foundation design by an experienced person having Local body enlistment or Listed M panel (Civil Engineer / Architects /designers /Supervisors etc) who can obtain local body Permit. Soil Investigation (if found necessary) 2. Fixing lay out by marking pegs .3.Earthwork excavation and dressing bottom & Sides.4. Laying lean cement concrete.pcc 1:5:10. xxxxxxxxxxxxxxxxxxxx .Foundation footing (stone/RCC Strip or isolated footings basement etc.6. Casting 12. RCC. Plinth band (belt) & DPC.7. Filling inside base ment. 8 Superstructure like Load bearing wall or raisng columns.Casting Lintel &GF Sun shades 9. Raising wall and finishing with bearing plaster 1:3 & lime wash 10. Centring & Shuttering for F F beam & ടlabxxxxxxxxxxxxxxxxxxxxxxxxxxxxx 11. Reinforcement works &laying Electrical conduiting.12 Casting Slab & beams &rendering on Top surface of slab with wpc compound.13 Curing days to 14 days depend upon grade of cement and de shuttering works after 7 days for smaller spans up to 4.50 m & after14 days for Span up to 6.00 m.14. placing Conduits for concealed wiring on walls, Fixing concealed water supply pipes & attachments, testing leakage etc .15. Fixing outer frames of doors & windows.16. Internal & external Plastering. 17. Fixing Sanitary & water Supply fittings.&testing Water / Soil Waste lines.18. Laying Underfloor lean concreting.19. Flooring works.20 Fixing shutters for doors & windows, Cupboards, interior decoration, Electrical fittings,Kitchen cupboards and carpentry works.21 External service works like Septic tank ,over head tank, all pipe lines ,fittings & Finishing works and getting building No: & user certificate etc for occupation.
Shan Tirur
Civil Engineer | Malappuram
contact me sir
unni krishnan
Home Owner | Palakkad
excellent work plan sir