concrete terrace il v board kondu bathroom paniyan.
terraceil ninnu 4 kalu vechu uyarthi Melitha room tte foundation level il ninnu solpum thathi athichittu v board kondu flooring um bhakki walls um cheyithu bathroom ondakunathu nalathu ano???
atho normal foundation ketti athil filling cheyithittu athinte mele v board wall kondu bathroom panithale water leaking varathe iriku annu ondo???. suggestions pls..
better to put fountation Wall 20 or 35 cm height.. put 60 cm with Block work.. can Fix two side steel frame for fixing VBoard.. and make Toilet as Proper plumping.. put Floor Concret as per the Level and make Water profing on top of Concrete an Wall side of 2ft.. and Pipe and Shower area Wall to Top where the water can be Leaked.. fix tile.. And B ready for use Toilet..
Gazeebo Interiors
Interior Designer | Kozhikode
better to put fountation Wall 20 or 35 cm height.. put 60 cm with Block work.. can Fix two side steel frame for fixing VBoard.. and make Toilet as Proper plumping.. put Floor Concret as per the Level and make Water profing on top of Concrete an Wall side of 2ft.. and Pipe and Shower area Wall to Top where the water can be Leaked.. fix tile.. And B ready for use Toilet..
Sajeev Raj
Contractor | Hyderabad
foundation is required in concrete