Roy Kurian
Civil Engineer | Thiruvananthapuram, Kerala
Column erection , rebar inspection before concrete
1
0
More like this
Roy Kurian
Civil Engineer
Columns above plinth , rebar & form work installation , ready for concrete.
Roy Kurian
Civil Engineer
Rebar errection for mat & column pedestal
Roy Kurian
Civil Engineer
Rebar installation , column mat top layer & pedestal
REDWUD CONSTRUCTION INTERIORS
Interior Designer
Strength Starts from the Base! Before a building touches the sky, its foundation must be rock solid! Here’s how column footing concrete ensures durability and stability for your dream home. #ConstructionMatters Watch till the end for expert insights!
Roy Kurian
Civil Engineer
Column footing concrete for apartment building @ Kazhakkoottom
Roy Kurian
Civil Engineer
Apartment , column rebar installation
Roy Kurian
Civil Engineer
Rebar errection for column mat & pedestal
Civil Code Hub
Civil Engineer
Hey 👷♂️ I’ve created a super-useful Construction Inspection Checklist (PDF) for civil engineers and site supervisors. It includes 3 ready-to-use checklists: ✅ Pre-Concreting ✅ Rebar Inspection ✅ Site Readiness 📥 Instant download — print and use at site! 🔗 Get it here: [https://civilcodehub.gumroad.com/l/hpcmb ] Share it with your team or friends in construction. Let’s work smarter on site! 💪 #constructionsite #CivilEngineer #site
A FRAME Developers
Architect
Rebar detection system - Many consultancies do wrong practice for conducting NDT(Non destructive test) for concrete . They simply select Random point As per revised IS code Before conducting NDT We have to ensure whether the test conducting Area should be free from reinforcement bars ( If not wrong result may get).Rebar detection system helps to locate rebars in concrete section. Then we do UPV (ultra sonic pulse velocity test) to ensure homogeneity of concrete in that particular area to which test is conducted . After only that we do Rebound hammer test (NDT) Note: Ultrasonic pulse velocity test for concrete is IS 516 (Part-5 Sec-1) : 2018. The old IS code for the UPV test is IS 13311 Part-1 Rebond hammer- IS 516 (PART-5 Sec-4) #StructureEngineer #KeralaStyleHouse #StrengthMatters #magicStructure #HouseDesigns #Designs #koloed #kolo-ed #koloapp #kolopost
Roy Kurian
Civil Engineer
Column footing concreting for Apartment building @ Kazhahakkoottom
Roy Kurian
Civil Engineer
Wall & column rebar work
Roy Kurian
Civil Engineer
First floor wall & column rebar installation
LINU ABRAHAM
Building Supplies
Ready made concrete septic tank manufacturing and erection
Dreamfill Builders And Interiors
Contractor
Column footing concrete work in progress.....
Roy Kurian
Civil Engineer
Inspecting the curing work after column concrete pouring
Roy Kurian
Civil Engineer
Wall construction , column rebar installation
Roy Kurian
Civil Engineer
Apartment building, Rebar errection for column pedestal
Roy Kurian
Civil Engineer
column concrete
Roy Kurian
Civil Engineer
column footing concrete for Apartment building
L K Designers and Developers
Contractor
work in progress... column footing and plinth beam concrete finished.... #plinth_beam #column_footing #lkdesignersanddevelopers #parumala