Design
Professionals
Advertise With Us
Post your Requirement
Design
Professionals
Advertise With Us
Post your Requirement
Roy Kurian
Civil Engineer | Thiruvananthapuram, Kerala
Column erection , rebar inspection before concrete
1
0
More like this
Columns above plinth , rebar & form work installation , ready for concrete.
Rebar errection for mat & column pedestal
Rebar installation , column mat top layer & pedestal
Column concreting..
column concrete on Kuzhalmannam site
Apartment , column rebar installation
Rebar errection for column mat & pedestal
Ready made concrete septic tank manufacturing and erection
#column footing concrete
Rebar detection system - Many consultancies do wrong practice for conducting NDT(Non destructive test) for concrete . They simply select Random point As per revised IS code Before conducting NDT We have to ensure whether the test conducting Area should be free from reinforcement bars ( If not wrong result may get).Rebar detection system helps to locate rebars in concrete section. Then we do UPV (ultra sonic pulse velocity test) to ensure homogeneity of concrete in that particular area to which test is conducted . After only that we do Rebound hammer test (NDT) Note: Ultrasonic pulse velocity test for concrete is IS 516 (Part-5 Sec-1) : 2018. The old IS code for the UPV test is IS 13311 Part-1 Rebond hammer- IS 516 (PART-5 Sec-4) #StructureEngineer #KeralaStyleHouse #StrengthMatters #magicStructure #HouseDesigns #Designs #koloed #kolo-ed #koloapp #kolopost
Wall & column rebar work
First floor wall & column rebar installation
#column concrete
before concreting
column footing concrete for Apartment building
Wall construction , column rebar installation
Apartment building, Rebar errection for column pedestal
column concrete
#Pedestal column concrete# site : Cherpulessery#
site visiting before concrete work
Kolo
Kerala
Civil Engineer
Roy Kurian
1629330131
Join the Community to
start finding Ideas &
Professionals