1.Earth work/m3
2.Retaining wall/m3
3.RR cubic rate
4.DR cubic rate/m3
PCC /m3
5.Plinth beam/m3
6.Lintel /m3
7.Beam /m3
8.Curb
9.sunshade/m3
10.RCC Slab/m3
11.Masonry unit rate or m3
12.Plastering/m2
It’s a project of 5000 sqft.
Can you please give me the rate for cubic / sqft / unit rate of above work .
contact number :-+91 99955 94482
Haridas Karinkal
Mason | Thrissur
sqft.70.യൂണിറ്റ് .3000.ലോഡ് 1.5.യൂണിറ്റ് 4000.ഹരി 9539.706754
Gopa kumar
Contractor | Thiruvananthapuram
80.781.22.733
Sasi Parammal Sasi P
Contractor | Kozhikode
8xxxxxxxxxxxxxxx8
Fasal Aboobacker
Civil Engineer | Kozhikode
Please Contact 9747-315555