Required materials
*Cement 65 to 70 bag
*Mettal 20mm size 200cft
*M.Sand 200cft
*Reinforcement 550kg
*Winding wire 3kg
*Covering block 100nos
Note:-Thickness-10cm
In case Beam,Consealed beam, admixture etc... should be provided extra material required.
Approx.1 lakh to 1.25 lakhs required for materials.
Gireesh Puthalath
Architect | Wayanad
Required materials *Cement 65 to 70 bag *Mettal 20mm size 200cft *M.Sand 200cft *Reinforcement 550kg *Winding wire 3kg *Covering block 100nos Note:-Thickness-10cm In case Beam,Consealed beam, admixture etc... should be provided extra material required. Approx.1 lakh to 1.25 lakhs required for materials.
റഷീദ് റഷീദ് എൻ എൻ
Contractor | Kannur
78 bag സിമെന്റ്,370ഫീറ്റ് മെറ്റൽ,190 ഫീറ്റ് സാൻഡ് 7 കിന്റൽ സ്റ്റീൽ
MASTERBUILT INFRASTRUCTURES
Contractor | Thrissur
Flat ano ? Reinforcement details undo ? Mix ratio eathanu idan pokunnathu. Contact for more information +917558056214
Navabavan Constructions
Contractor | Thrissur
1Lakhs