After foundation, I am keeping 3 rows of basement, and belt. After that will keep. sand or earth filling to level up to the first basement row. this is done because the height of the road mid level is lower than the foundation. is this process done is OK. wil there be any issue s due to the water leaking in to basement. red laterite stone used for basement and foundation
likes
2
comments
3

Comments


Homedesigndecor ๐Ÿ“ž9567505835
Homedesigndecor ๐Ÿ“ž9567505835

Contractor | Thrissur

if there an issue with water leckage problem use water proofing compound with the belt concreting

MGM Waterproofing  CONSTRUCTION CHEMICALS
MGM Waterproofing CONSTRUCTION CHEMICALS

Building Supplies | Kottayam

Checkout designs added by MGM WATERPROOFING on Kolo https://koloapp.in/posts/1628791314

MGM Waterproofing  CONSTRUCTION CHEMICALS
MGM Waterproofing CONSTRUCTION CHEMICALS

Building Supplies | Kottayam

Damp proof course (DPC) เดšเต†เดฏเตเดฏเตเด•. เด…เดฒเตเดฒเต†เด™เตเด•เดฟเตฝ เดˆเตผเดชเตเดชเด‚ เดตเดฐเดพเตป เดธเดพเดงเตเดฏเดคเดฏเตเดฃเตเดŸเต Checkout designs added by MGM WATERPROOFING on Kolo https://koloapp.in/posts/1628682501